For concrete & masonry crews of 1–5

Pours quoted with the prep, the access and the pump in the number.

Photograph the grade, the access and what's coming out. QuoteProof scopes demo, forming, pour and finish with crew hours priced on what a day of your crew and equipment costs.

7 days free · no card · rates set up in about three minutes

Get it on Google Play

QuoteProof is estimating software for concrete and masonry contractors. Photograph the grade, the access and the demo, and it drafts forming, pour and finish lines with crew hours priced on your real labor, material, equipment and drive costs. The customer approves on a link and the pour closes with photo proof.

9:41Capture · QuoteProof

Hollis Ave — leak call

On site · today 8:42 AM

Shutoff valve
Ceiling stain
Riser
Meter
Access panel
Wall
6 photos · time + location stamped
Draft the quote

Three ways concrete & masonry quotes lose money quietly

Access you didn't walk

If the truck can't reach it, somebody is pushing it. Wheelbarrow runs are hours, and they belong in the quote instead of your back.

Subgrade and base prep

Digging, compacting and hauling in base is most of the day. It disappears fast when you quote a slab by the square foot in your head.

Weather days and finish crew

A pour that goes long needs a finisher standing there at 8pm. Those hours are real; price the crew, not the concrete.

A concrete & masonry quote, priced honestly

Driveway replacement — 640 sq ft, 4 inch with fiber. Your customer sees the scope, the hours and the photos. The costs underneath are yours alone.

Equipment, hauling, mileage and quoting time — $492.00 — counted before the price, never shown to the customer.

The cracked slab before, the prepared base, the pour, and the finished and sealed surface — time-stamped in one link.

9:41Your quote

Concrete & masonry

Driveway replacement — 640 sq ft, 4 inch with fiber

  • Break out and haul old slab · 12 hrs$1,020.00
  • Grade, base and compaction · 10 hrs$850.00
  • Form, pour and finish · 16 hrs$1,360.00
  • Concrete, base stone, forms, sealer, disposal · materials$2,460.00
Total$6,182.00
Approve this quote

No account. No app. Opens on any phone.

9:41Proof of work

Bell Plumbing & Drain

Hose bib replacement · complete

Before

Before · Aug 14

After

After · Aug 14

  • Scope matched what was approved
  • New bib pressure tested
  • Drywall patched and painted
Verified by the customer · Aug 14, 4:12 PM

Proof beats a callback argument

  • Before and after photos with the time and place they were taken
  • The scope they approved, word for word, beside the work you did
  • Their own sign-off on the finished job, on the record
  • Every job exportable for your books, mileage log included
Start free

Concrete & masonry quoting questions, answered

Does equipment and pump cost get included?

Yes. Pump, skid steer and hauling are costs on the job, not a surprise you absorb after the truck leaves.

How do I price bad access?

Photograph the route. Wheelbarrowing 40 yards instead of chuting it is hours, and those hours go on the line item.

What about demo and disposal?

Breaking out and hauling old concrete is its own line with hours plus dump fees in the cost model.

Can I quote block, brick and flatwork together?

Yes. Each scope gets its own line with hours and material at your loaded crew rate.