How to Quote a Job: Pricing Labor, Materials and Drive Time
Updated October 2026
To quote a price for a job, multiply the hours by your real hourly rate, add materials at cost plus your markup, add the drive time and mileage to get there, then add disposal and permits and put an expiry date on it. Below is each step, then a worked $465.75 leak call you can copy.
3 lifetime AI quote drafts for $0 before your trial starts, including rebuilds. Your 7 days start when your first quote goes out. No card needed.
How to quote a price for a job in 6 steps
- Walk the job and photograph every area you'll touch, wide shots and close-ups.
- Write one scope line per piece of work.
- Price the labor: hours × your real hourly rate (the section below shows how to find it).
- Price the materials at your cost plus your markup.
- Add drive time and mileage, disposal, and permits on their own lines.
- Add an expiry date and your terms, and send it the same day. See the worked example.
Job pricing: hourly, fixed price or per unit?
Hourly suits diagnostic and unknown-scope work: a leak you have not opened yet, a no-cool call, a car that just will not start. You bill the hours you actually spend, so you are not guessing what is behind the wall.
A fixed price suits a scope you can see, and it is what most homeowners want. They want one number they can say yes to. You take the risk if the hours run long, so only lock a fixed price when the photos show the whole job.
Per-unit (per square, per sq ft, per fixture) suits repeatable work: roofing squares, paint by room or wall, fixtures swapped, board hung. You still have to know what one unit costs you.
Whichever you use, the number underneath is still hours × rate + materials × markup + drive. A $12-per-sq-ft floor is your hours, your waste, your drive and your markup rolled into one figure. Try it in the contractor estimate calculator.
Try it: contractor estimate calculator
Same math as this guide. Plug in your hours, rate, materials, drive and extras. Nothing is saved. Full-page version: contractor estimate calculator. Word / PDF / Sheets templates if you want a printable form instead.
- Labor
- $350.00
- Materials (with markup)
- $86.40
- Drive ($19.60 mi + $70.00 time)
- $89.60
- Disposal + permits
- $0.00
- Estimated total
- $526.00
This is a pricing worksheet, not a customer-facing quote. Use the total to sanity-check the price before you write it up.
Start with your real hourly rate
Your hourly rate is what you charge for an hour on site. It has to pay for everything, not just you: the truck, fuel, insurance, tools, phone, software, the accountant, the hours you spend quoting and driving, and some profit. If your rate covers all that, you don't need to pile "overhead" on top of each job.
Here's the method. The numbers are an illustrative example only, so plug in your own:
- What you want to take home in a year. Example: $70,000.
- Your yearly overhead. Add up the truck payment, fuel, insurance, tools, phone, software and so on. Example: $24,000.
- Add them. $94,000.
- Hours you can actually bill. Not 2,000. Take out quoting, supply runs, driving, invoicing, callbacks, weather and time off. Example: 1,200 billable hours.
- Divide. $94,000 ÷ 1,200 = $78.33 an hour just to break even.
- Add profit. At 15% in this example: $78.33 × 1.15 = $90.08, call it $90/hr.
Most people get step 4 wrong. Count your real billable hours for a month and you'll probably find it's fewer than you thought. If you have a helper, run the same math for them (wage, payroll costs, workers' comp, their share of the truck, profit) and price their hours at that rate, not yours.
For hours per job, use your own history. If the last four water heater swaps took you three hours, it's a three-hour job. Count setup, cleanup and access: second floors, crawlspaces and no parking all add time.
Materials: cost plus your markup
Markup pays for the trip to the supply house, ordering, waste, returns, and the wrong part you have to take back. Pick a markup that covers what that handling actually costs you, then use it every time.
Know the difference between markup and margin:
- Markup is a percentage of your cost. $72.00 of parts + 20% = $86.40.
- Margin is a percentage of the price. On that same $86.40, your $14.40 is 16.7% of the price, not 20%.
| Markup on cost | Margin on price |
|---|---|
| 10% | 9.1% |
| 20% | 16.7% |
| 25% | 20.0% |
| 50% | 33.3% |
Don't give away the drive: time and mileage
Driving costs you twice: the truck and your time. Three ways to charge for it:
- Mileage plus drive time. Round-trip miles × your per-mile cost, plus drive hours × your rate. The most accurate.
- A flat trip charge for anywhere in your normal area. The simplest.
- Zones: a trip charge that steps up with distance.
Your per-mile cost is your own number: fuel, tires, maintenance, insurance and depreciation, divided by the miles you drive. The IRS publishes a standard mileage rate each year, which is useful as a sanity check, but it isn't your actual cost. Keep a mileage log either way. You'll want it at tax time.
On small jobs, the drive can be most of the cost. A 30-minute fix 25 minutes away is really a 1.5-hour job. Set a minimum charge so a small job never goes out below what it costs you to show up.
Disposal, permits and the small stuff
These are the lines that quietly eat your profit when they're left off:
- Dump fees and haul-off
- Permit fees and the time to pull and close the permit
- The extra supply-house run
- Equipment rental
- Anything you can't see yet. Put it on its own line with the number you're assuming, rather than burying it in labor.
Pricing what you can't see yet (contingency)
Some of the job stays hidden until you open it up: what's behind the wall, what's under the flooring, a seized fitting. Don't bury a guess in the total. Price that part one of two ways. Quote it hourly at your rate, with a written note of what you'll do if you find more. Or add it as its own line, clearly labelled as an allowance, with an expiry date like the rest of the quote.
Tell the customer in writing what triggers it, for example "if the subfloor is soft under the tile", and that you'll show them photos and get their OK before that line is used. If nothing turns up, it comes off the bill.
A worked example: a $465.75 leak call
This is an illustrative sample job: a leak call on Hollis Ave, as shown on QuoteProof's $465.75 sample quote.
| Math | Amount | |
|---|---|---|
| Replace hose bib | 1.5 hr | |
| Repair ceiling drywall | 1 hr | |
| Labor | 2.5 hr × $140/hr | $350.00 |
| Materials | $72.00 + 20% markup | $86.40 |
| Drive | 28 mi round trip | $29.35 |
| Total | $465.75 |
On the quote, the customer sees one price per line (hose bib $210.00, drywall $140.00, materials $86.40, travel $29.35) and the total. They don't see your costs or the 20% markup. That's normal: you're pricing the job, not handing over your cost sheet.
Check the total against the job: does $465.75 make sense for two and a half hours plus a parts run and a 28-mile round trip? If it feels low, the problem is usually one of the inputs (rate, hours or drive), not the math.
Pricing by trade
The method is the same in every trade. What changes is where the hours hide.
- Plumbing: access and drive are the big ones. Price the leak you photographed with your drive on its own line. See the plumbing estimate app page.
- Electrical: troubleshooting time and permit time belong on their own lines, not buried in the install. See electrical.
- Painting: prep is usually more hours than paint. Price prep and coats separately, room by room. See painting.
- Roofing: tear-off, decking and disposal are separate lines, and decking you can't see yet is an unknown on its own line. See the roofing estimate app.
- Landscaping: haul-away, plant material and access hide the hours. Price each area you photographed, then add dump runs on their own line. See the landscaping estimate app.
- Auto body: intake photos set the estimate. Price labor, parts, paint and materials from the damage you shot, not the story they told. See auto body estimating software.
- Carpentry: finish hours and lumber waste decide the number. Price trim, decks and built-ins from the photos, with materials at cost plus markup. See the carpentry estimate app.
- Handyman: lots of small jobs means the drive and your minimum matter most. Price a punch list task by task, then add setup and cleanup time for each one, and charge one minimum per visit, not per task. Anything that has to dry (drywall mud, grout, caulk) means another trip, so count it. See the handyman estimate app page.
Price it once, reuse it: your rates in QuoteProof
QuoteProof stores your numbers once: hourly rate, materials markup, and drive time and mileage. You take photos of the job, it drafts the scope and line items from your photos and notes, and it prices them with your numbers. You review every line before anything goes out. The customer approves on a link with their name and a date stamp, sees one price per line and the total, and never sees your costs or your markup. It doesn't process payments. Once it's priced, here's how to write the quote. Or send it from a contractor quote app that prices on your rates. Still choosing a tool? Compare each job quote app contractors look at most.
See the $465.75 sample quote · Estimate calculator · Estimate templates · Pricing: Solo $29/mo (1 user, 10 new jobs a month, QuickBooks sync, week schedule board), Solo Plus $49/mo (1 user, unlimited jobs, QuickBooks sync, week schedule board). 7 days for $0. No card. Printable checklist: Contractor Photo-Quote Checklist (PDF).