For electrical crews of 1–25

Panel photos in, a code-honest quote out, approved before you leave the driveway.

Shoot the panel, the service drop, the room. QuoteProof turns it into scoped line items with hours, priced on your real cost of doing the work.

7 days free · no card · rates set up in about three minutes

9:41Capture · QuoteProof

Hollis Ave — leak call

On site · today 8:42 AM

Shutoff valve
Ceiling stain
Riser
Meter
Access panel
Wall
6 photos · time + location stamped
Draft the quote

Three ways electrical quotes lose money quietly

Troubleshooting time you never bill

Two hours chasing an intermittent fault becomes a line item you feel awkward writing. Put the hours in the quote and let the customer approve them up front.

The panel you found behind the drywall

What you opened up matters as much as what you installed. Time-stamped before photos make the change order a conversation instead of a fight.

Permit and inspection hours

Pulling the permit, meeting the inspector, driving back. That's office and drive time — it's in your rates, so it's in the number.

A electrical quote, priced honestly

200A service upgrade + EV charger. Your customer sees the scope, the hours and the photos. The costs underneath are yours alone.

Drive time, mileage and quoting time — $242.10 — counted before the price, never shown to the customer.

Old panel, new panel, torque-marked terminations, charger installed, and the inspection tag.

9:41Your quote

Electrical

200A service upgrade + EV charger

  • 200A panel and meter base swap · 8 hrs$1,120.00
  • Level 2 charger circuit, 60A · 3 hrs$420.00
  • Panel, breakers, conductors, hardware · materials$1,240.00
  • Permit, utility coordination, inspection · 2 hrs$280.00
Total$3,302.10
Approve this quote

No account. No app. Opens on any phone.

9:41Proof of work

Bell Plumbing & Drain

Hose bib replacement · complete

Before

Before · Aug 14

After

After · Aug 14

  • Scope matched what was approved
  • New bib pressure tested
  • Drywall patched and painted
Verified by the customer · Aug 14, 4:12 PM

Proof beats a callback argument

  • Before and after photos with the time and place they were taken
  • The scope they approved, word for word, beside the work you did
  • Their own sign-off on the finished job, on the record
  • Every job exportable for your books, mileage log included
Start free