For flooring crews of 1–5
The subfloor decides the price. Photograph it before you quote it.
Shoot the existing floor, the transitions and the subfloor condition. QuoteProof scopes tear-out, prep and install with hours, prices the material and waste you actually buy, and the customer approves on a link.
7 days free · no card · rates set up in about three minutes
QuoteProof is flooring estimating software. Photograph the existing floor, the transitions and the subfloor, and it drafts tear-out, prep and install lines with hours priced on your real labor, material and drive costs. The customer approves on a link, and the finished floor closes with time-stamped before-and-after photos.
Hollis Ave — leak call
On site · today 8:42 AM
Three ways flooring quotes lose money quietly
The subfloor under the old carpet
Soft spots, height differences, a slab that needs leveler. You find it after tear-out, and by then the price is already agreed.
Waste on diagonals and patterns
A herringbone run doesn't waste like a straight lay. Quote the boxes you buy, not the square feet you install.
Furniture, appliances and transitions
Moving a house full of furniture and cutting twelve transitions is hours. Put them on the quote before you carry the first couch.
A flooring quote, priced honestly
LVP install — 900 sq ft main floor, tear-out included. Your customer sees the scope, the hours and the photos. The costs underneath are yours alone.
Disposal, mileage and quoting time — $246.00 — counted before the price, never shown to the customer.
The old floor, the bare and leveled subfloor, and the finished install with transitions — one time-stamped link.
Flooring
LVP install — 900 sq ft main floor, tear-out included
- Tear out carpet and pad, haul off · 6 hrs$510.00
- Subfloor prep and leveling allowance · 5 hrs$425.00
- Install LVP, 900 sq ft · 20 hrs$1,700.00
- LVP with waste, underlayment, trim, transitions · materials$3,240.00
No account. No app. Opens on any phone.
Bell Plumbing & Drain
Hose bib replacement · complete
Before · Aug 14
After · Aug 14
- Scope matched what was approved
- New bib pressure tested
- Drywall patched and painted
Proof beats a callback argument
- Before and after photos with the time and place they were taken
- The scope they approved, word for word, beside the work you did
- Their own sign-off on the finished job, on the record
- Every job exportable for your books, mileage log included
Flooring quoting questions, answered
How do I price subfloor problems I can't see yet?
Quote a prep allowance as its own line, then photograph what you find and send a change order against that photo.
Is waste factored into material?
Price the material you buy, including waste on diagonals and patterns, not just the square footage you cover.
Does tear-out and disposal get counted?
Yes. Tear-out hours, hauling and dump fees are lines and costs in the model, not a free Saturday.
Can I quote tile and hardwood in the same job?
Yes. Each room or material gets its own line with its own hours and material.